Ibrahim’s Response … And Mine …


Ibrahim did not like my whiteboard note. Of course he did not. It’s too spot on. And could cause a world of trouble for ATP if I keep it up. Here’s what he said.

Screen Shot 2015-11-11 at 12.10.24 AM

Here’s my response;

Screen Shot 2015-11-11 at 12.11.14 AM

Of course, I’m bullshitting. I know fine well that Ibrahim is blaming us and that he is utterly two-faced and thinks we are all idiots. I know he has convinced Ahmed that everything is all our fault – which is not so difficult because Ahmed wants someone to blame and it is easier to blame us than ATG (Ahmed never shows any loyalty, no doubt because he has none). According to ATP, we cause problems by not following ATP’s procedure (not true), but they’re the ones that keep taking quotes and contractors away from us. Like the scaffolding: Seven and a half weeks we have been waiting for this to turn up while ATP refuses to tell us what is going on. Meantime, every time we ask where it is, we get the same vague answer, “It’s being dealt with.” Right, like that takes seven and a half weeks. Meantime we can do nothing to get the sets built.

I asked about the buses today, Ibrahim told me, “The contract is being processed.”

I asked about the Patrols. “They are being bought tomorrow.”

Oasis? “We’ll sort it out now.”

Scaffolding? “I promise that will arrive today or tomorrow.” Oh wait, that was his promise yesterday, the day before, the day before, and last week.

And it still has not arrived.

Days We Have Been Ready To Build & ATG’s Lies


The situation so far…

Days We Have Been Ready To Build...

So 52 days ready to build and no money to pay for anything. Nada. Zilch.

Specifics are as follows;

Build caves – told Production 7 weeks and 3 days ago we were ready to build. Submitted quote for scaffolding. Scaffolding is needed to build the platforms the caves will sit on. Until we have scaffolding, we cannot begin building the caves. After 52 days, still no scaffolding.

Build rocket launch control room – told Production 7 weeks and 3 days ago we were ready to build. Submitted quote for scaffolding (the same quote as the caves as it was all part of one quote). Until we have scaffolding, we cannot build the ‘RLCR’ because it is needed to build the roof which needs to go in first. After 52 weeks, still no scaffolding. By the way — here’s the design for the RCLR.

Rocket Launch Control Room - 1st Floor (Emergency Mode) - 02 Nov 2015

Rocket Launch Control Room – 1st Floor (Emergency Mode) – 02 Nov 2015

Rocket Launch Control Room - Grd Floor (Emergency Mode) - 02 Nov 2015

Rocket Launch Control Room – Grd Floor (Emergency Mode) – 02 Nov 2015

Buses – we need five buses modified to look new and to be suitable for crashing. We had a contractor lined up to do the work. We were told it would take them about six weeks ago. We submitted their quote to Production five weeks ago. They promised to action it immediately. They didn’t. We still have no buses.

Buy Patrol Wagon vehicles – we need two. Production told us they will be bought tomorrow. That was four weeks ago. That’s a lot of tomorrows.

Oasis – Maysaa did a ton of work to get the quote and scope of works ready in time (totally professional as she is a full-qualified architect). Ahmed promised it would be approved by the end of the week. That was three weeks ago. It still has not been approved.

Range Rovers – this is priceless. Literally. Ahmed wants two Range Rovers so he can crash one of them. Total cost just under $250K. This despite the fact the pilot episode Art Dept budget should really be $500K. He said we would get them through Product Placement. That was five weeks ago. Fadi – head of PP – has been emailed by Ray around 10 times about this over the last four weeks. Total number of replies. Zero. Nada. Zilch.

Since arriving in Qatar, ATP has been emphasizing how we are all a team. And yet I have heard from numerous sources that despite the fact ATP has provided us with zero funds to build anything, they have been quietly blaming the Art Dept for not building anything. Even Ahmed has been extremely abusive about the Art Dept.

The only money we have had access to is petty cash which has had to come out of Majid’s own bank account. That’s right. ATP has no legal or financial presence in Qatar — even now — so it depends upon passing petty cash through an employee to pay for trinkets!!! (Is this further proof they are embezzling funds???)

This all seems to reinforce the rumour that ATP has no intention of shooting in Qatar. That it is doing whatever it can to force the shoot back to Jordan. And that it will blame anyone it can (easiest target — Art Dept) to achieve this goal.

What it does not explain is Ahmed. Why is he also blaming the Art Dept? Is he stupid? Is he in on whatever ATP is up to? Has he an alternate plan? Whatever it is, alienating the Art Dept is achieving nothing.

I had a chat with (local unnamed crew member) yesterday. He was appalled about what is going on. He reminded me of a site meeting a few weeks ago about the buses where Ibrahim promised to take responsibility for the buses after our contractor pulled out due to their having been messed about too much by ATP. He made the promise in front of Azmi, Ray, Rita, Hamad, myself, and several other people. When I wrote an email of the minutes of this site meeting, he denied saying it. Everyone was appalled by his bald-faced lie but (local unnamed crew member) was livid. He said that is when it sank in what a complete liar Ibrahim is.

It’s Being Processed…


I’ve been trying to avoid saying or thinking it, but I think we’ve reached the point where I have to accept that we will never film in Qatar. If anywhere at all.

It’s been six weeks (around Sept 19th) since we first presented quotes to ATP for scaffolding so we could begin work on the caves and rocket launch control room. And after all that time we still do not have any scaffolding.

Last Wednesday morning, I called a meeting between Production and the Art Dept to ask why no-one seemed to agree on who was responsible for sorting out the scaffolding. At the time, I was being told that Azmi was saying Hamad was doing it and Hamad was saying that Azmi was doing it. Hamad said it was not his job because he is not an expert on scaffolding and that that was the Art Dept’s job. At which point, Jude informed us that scaffolding had been bought from a company we had not recommended. I asked for confirmation they would be providing what we had asked for but she could not do that. Hamad then tried to justify it being bought without the Art Dept being consulted, to which I pointed out that he had just said the Art Dept was the experts so why was he justifying Production buying scaffolding without our input?

Expressing concern that we had no way of knowing what had been ordered, I asked for the supplier’s list. After three days I still did not have it. Instead, I got the list they used to buy it — a list that had been confirmed to be out-of-date weeks earlier; a list that did not list all the individual components needed because it was based upon detailed conversations between the Construction Dept and another contractor. Put it another way, Production had fucked up once again.

Ibrahim then emailed me asking why the Art Dept was causing problems. Antony pointed out to Ibrahim that we were trying to prevent problems. Ibrahim said we should wait until the scaffolding arrives and then see if anything was missing and that, if it was, he would buy or hire replacement scaffolding immediately.

And that is what it has been like for the last seven and a half weeks.

Another Fun Week With ATG


It’s been another ‘fun’ week at ATG.

Talal visited last week, and while he seemed to be at a bit of a loss as to what to do, looking like a lost schoolboy, his presence still caused its own fair share of chaos. After three weeks of atrocious Wi-Fi in the office, Talal instructed the runners to go and buy a 4G mobile internet modem. Our pleasant surprise was short lived. After half an hour of actual proper Internet access, we suddenly lost access when Talal had the password changed (unannounced) so only he could use it. But on the plus side, we got paid on time, no doubt the result of Talal not wanting to sit with a group of people pissed off at not being paid wages. This also meant that Andrew’s reply (sent while Talal was with us) to Ibrahim’s email encouraging us to accept monthly wages was met with an extremely brief, inarticulate, and equally ambiguous reply from Talal.

Screen Shot 2015-08-24 at 10.42.37

Somehow, I doubt Talal’s email will be the end of the matter. And indeed, Terry’s email to Jude this afternoon, reminding her that our wages are supposed to be paid today, was met with an unsurprising silence.

On Thursday evening, I was dragged out on a recce to the hangar with Talal, Majid, Issam and Ahmed. When it became apparent that using the actual hangar as an office was a ridiculous idea, Talal proposed that we go to Katara village (where Ahmed has an office), and that we aim to get some office space there. For a moment, as we were sitting with the manager of the entire Katara Village facility and a rather lengthy conversation took place in Aramaic, I actually thought Talal was asking to rent an office. But as we left, I discovered that Talal had in fact been trying to blag an office for free on this $50 million production!!! As a result, we were offered the use of the unused canteen — an area that included a corridor through which people traipsed on a constant basis.

Talal then took us for dinner. Conversation fluctuated between animated Aramaic conversation and awkward silence. When it came time to pay the bill, the waiter handed it to Talal who promptly shoved it towards Majid so that he could pay out of the show’s budget. The food was good though, and we eventually left.

The other bizarre thing that happened was that after a few days of listening to Issam and Ahmed talk naively about hiring production designers like Gavin Bouquet (Star Wars) and Stuart Craig (multi-Academy award-winning designer whose credits include Harry Potter movies), Talal decided that we did not need a designer since Chris had already designed the show.

Well, never mind the fact that only about 5% had been designed and none of it locked! It cannot be overstated what a moronic thing this is to say.

Aside from the fact that not all of the sets have been designed, a designer is needed to see the designs through to completion of their construction. And let’s not get onto supervising design during the shoot! I can only assume that they do not want a designer because that way the art department has no real authority. And given that we have been such a nuisance with our constant requests to buy props, dressing and materials and crew to build sets and so on, (you know, the kind of stuff that a show usually has), well, who can blame them? 

Today there was a new development. This morning Bob emailed me to tell me that he had sent an email to ATG informing them that he had contacted a barrister who has told him that ATG has repeatedly been in breach of contract due to its failure to pay his wages on time, its failure to pay his last few weeks wages, and also that they had doctored his contract and gotten him to sign it under duress, and because of this if they do not pay him the rest of the money that he is owed by the end of this Wednesday the copyright of all his work will revert to him. They’re so stupid they may not pay.

Today, when I proposed to ATG that we hire the construction manager I had found if we were not getting a designer yet, it was suggested to me that maybe I could be the production designer, the art director and the construction manager! It would be funny if it weren’t so ridiculous. Needless to say, my answer was brief and it was a very short conversation….

The last thing to happen today, Ahmed emailed me saying that he would like to talk about how some of the old designs were no good. He asked me if he should give me his notes on the set or give them to the new designer once one had been appointed. Clearly, he does not know that they do not intend appointing one.

Or were they lying to me (I actually found out through Bob as they did not even bother to tell me), when they said they were not going to get one? And if so, why…?

FOOTNOTE APRIL 21st, 2017

Since I never signed a contract with Arab Telemedia AND I’m owed money, the hi-lighted text above (bold and italics) would mean that all work done by me on Medinah remains my property. As such, ANY attempt by the show’s owner’s to sell or broadcast it shall be illegal and subject to a potential major lawsuit by me.

Strike Action Update


Though we worked, we did not go into the office Thursday or Saturday (Friday being our day off). Abdul knew we were working because I had told him we were.

This morning I got a call from Abdul. I then emailed the crew summarising what he had said;

  1. Abdul had joked about his points not being alphabetical.
  2. He said we would be paid Monday or Tuesday.
  3. That “we” [he did not say who “we” are] reserved the right to not pay us for days we do not show up in the office even if we say we have been working.
  4. There was no apology.
  5. No explanation.
  6. The tone of the entire email was immature and offensive.

This requires further explanation.

The “alphabetical joke” is a reference to the email Ibrahim and Ahmed were sent saying we would not come back to the office or share our work until we had been paid up in full.

Abdul also started by saying, “Is this the leader of the Devine Clan?” I pointed out — as Ray had apparently done to him last Thursday when he said the same thing about me — that all the UK crew were in agreement about this. But still Abdul likes to joke about it.

When I told Abdul we had been working in our rooms, he said “But how do we know that?” I replied it is a point of trust. He said “You could be lying.” (!!!)

There’s a principle of psychology that the thing people despise most in others is the thing they are most guilty of. ATG thinks everyone is trying to stitch them up or is lying to them because this is what ATG does to everyone every day.

At no point did Abdul offer an explanation to me or an apology. ATG and its staff don’t do apologies (actually, Ibrahim and Majid have apologised a few times — good for them).

Anyway, Chris told me it all “kicked off” Thursday night between the email and Simon going on the ‘offensive’. There were calls between Talal and Ibrahim and Abdul and Fadi and they ran into Friday. Chris said ATG had fucked up. They couldn’t make payments because Fadi and Talal had both been away. But that’s just nonsense. That excuse can only be used so many times before it becomes utterly ridiculous and we’ve heard it too many times already. ATG fuck up because they want to. It’s part of their MO for screwing with other people’s heads and reminding them who’s boss.

Oh by the way…

I emailed Abdul afterwards asking for clarification on whether or not our pay would be deducted for yesterday and last Thursday.